Interval multi-attribute bottleneck identification in job shop
WANG Jun-qiang1,2, CHEN Jian1,2, WANG Shuo1,2, GUO Yin-zhou1,2,ZHANG Ying-feng1,2, SUN Shu-dong1,2
1.Institute of System Integrated & Engineering Management, Northwestern Polytechnical University, Xi'an 710072, China;2.Key Laboratory of Contemporary Design and Integrated Manufacturing Technology, Ministry of Education, Northwestern Polytechnical University, Xi'an 710072, China
WANG Jun-qiang1,2, CHEN Jian1,2, WANG Shuo1,2, GUO Yin-zhou1,2,ZHANG Ying-feng1,2, SUN Shu-dong1,2. Interval multi-attribute bottleneck identification in job shop[J]. .
[1]LIU Yong, GU Hanyu, XI Yugeng. Planning and scheduling algorithm based on TOC for complex hybrid Flow shop problems[J]. Computer Integrated Manufacturing Systems, 2005, 11(1): 97-103(in Chinese). [刘勇,谷寒雨,席裕庚.基于约束理论的混合复杂流水线规划调度算法[J].计算机集成制造系统,2005,11(1):97-103.]
[2]ZUO Yan, GU Hanyu, XI Yugeng. Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck[J].Journal of Systems Engineering and Electronics,2007,18(3):556-565.